Carrier operating and maintanance Spezifikationen Seite 74

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 116
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 73
5-376-000097
REV. 1 - 12/08
Section II: Operation
Page 64
19. Remove the wheel chocks from
the carrier's rear tires.
20. Disconnect the power take-off
(PTO). Refer to PTO operator’s
manual. NEVER TRAVEL WITH
THE POWER TAKE-OFF
CONTROL ENGAGED. This
could result in damage to the
PTO unit and the recovery
vehicle’s transmission.
21.Use the reverse order for
unloading.
WARNING:
Properly secure the vehicle to the wheel grid using tie-down straps.
Tie-down straps should be tightened periodically during the tow as
the tires settle into the grid from towing.
WARNING:
Properly secure the vehicle using safety chains from the vehicle to
the carrier subframe.
TAKE-OFF
AKE-OFF
IN
IN
OU
Seitenansicht 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 115 116

Kommentare zu diesen Handbüchern

Keine Kommentare