Carrier operating and maintanance Spezifikationen Seite 51

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 116
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 50
5-376-000097
REV. 1 - 12/08
Section II: Operation
Page 41
11. Slowly lower the Winch Control
handle to take-up any slack in
the wire rope/cable to allow the
front tie-downs to become slack
and loose.
12. Remove the tie-downs from the
front of the vehicle.
CAUTION:
NEVER walk or climb on the
deck surface.
13. Raise the Winch Control handle
and start unreeling the wire rope/
cable from the winch. Unreel
enough of the wire rope/cable
from the winch to allow the
vehicle to roll/slide off of the
carrier deck.
WARNING:
Maintain a minimum of five (5)
wraps of wire rope/cable on the
winch drum at all times. Also
maintain a uniform wrap of wire
rope/cable on the drum to avoid
crushing of the wire rope/cable.
14. Set the vehicle's parking brake
and put the transmission into
Park.
Seitenansicht 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 115 116

Kommentare zu diesen Handbüchern

Keine Kommentare