Step 9 Low Voltage Wiring
THERMOSTAT CONNECTIONS The thermostat should
be wired directly to the Aquazone control board. See
Fig. 19, 20, and 22.
WATER FREEZE PROTECTION The Aquazone control
allows the field selection of source fluid freeze protection
points through jumpers. The factory setting of jumper JW3
(FP1) is set for water at 30 F. In earth loop applications, jumper
JW3 should be clipped to change the setting to 13 F when
using antifreeze in colder earth loop applications. See Fig. 24.
AIR COIL FREEZE PROTECTION The air coil freeze
protection jumper JW2 (FP2) is factory set for 30 F and should
not need adjusting.
ACCESSORY CONNECTIONS Terminal A on the control
is provided to control accessory devices such as water valves,
electronic air cleaners, humidifiers, etc. This signal operates
with the compressor terminal. See Fig. 25. Refer to the specific
unit wiring schematic for details.
NOTE: The A terminal should only be used with 24 volt
signals not line voltage signals.
WATER SOLENOID VALVES Water solenoid valves may
be used on primary secondary pump and ground water installa-
tions. A typical well water control valve wiring, which can
limit waste water in a lockout condition is shown in Fig. 25. A
slow closing valve may be required to prevent water hammer.
When using a slow closing valve, consider special wiring con-
ditions. The valve takes approximately 60 seconds to open
(very little water will flow before 45 seconds) and it activates
the compressor only after the valve is completely opened by
closing its end switch. When wired as shown, the valve will
have the following operating characteristics:
1. Remain open during a lockout
2. Draw approximately 25 to 35 VA through the Y signal
of the thermostat.
PRE-START-UP
System Checkout
When the installation is complete,
follow the System Checkout procedure outlined below before
starting up the system. Be sure:
1. Voltage is within the utilization range specifications of the
unit compressor and fan motor and voltage is balanced
for 3 phase units.
2. Fuses, breakers and wire are correct size.
3. Low voltage wiring is complete.
4. Piping and system flushing is complete.
5. Air is purged from closed loop system.
6. System is balanced as required. Monitor if necessary.
7. Isolation valves are open.
8. Water control valves or loop pumps are wired.
9. Condensate line is open and correctly pitched.
10. Transformer switched to lower voltage tap if necessary.
11. Blower rotates freely shipping support is removed.
12. Blower speed is on correct setting.
13. Air filter is clean and in position.
14. Service/access panels are in place.
15. Return air temperature is between 40 to 80 F heating and
50 to 110 F cooling.
16. Air coil is clean.
17. Control field selected settings are correct.
IMPORTANT: Connecting a water solenoid valve can
overheat the anticipators of electromechanical thermo-
stats. Only use relay based electronic thermostats.
NOTE: Low voltage connector may be removed for easy installation.
Fig. 23 Low Voltage Field Wiring
Typical
Water
Valve
C
A
24 VAC
Terminal Strip P2
AQUAZONE CONTROL (C Control Shown)
Fig. 24 Typical Aquazone Control Board
Jumper Locations
Fig. 25 Typical D Control Accessory Wiring
Seitenansicht 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare