Water Supply and Quantity
— Check water supply. Water
supply should be plentiful and of good quality. See Table 4 for
water quality guidelines.
In all applications, the quality of the water circulated
through the heat exchanger must fall within the ranges listed in
the Water Quality Guidelines table. Consult a local water treat-
ment firm, independent testing facility, or local water authority
for specific recommendations to maintain water quality within
the published limits.
GROUND-LOOP APPLICATIONS (Not Applicable to
50RHC,RVC Units) — Temperatures between 25 to 110 F
and a cooling capacity of 2.25 to 3 gpm of flow per ton is rec-
ommended. In addition to complying with any applicable
codes, consider the following for system piping:
Limit piping materials to only polyethylene fusion in the
buried sections of the loop.
Do not use galvanized or steel fittings at any time due to
corrosion.
Avoid all plastic to metal threaded fittings due to the
potential to leak. Use a flange fitted substitute.
Do not overtighten connections.
Route piping to avoid service access areas to unit.
Use pressure-temperature (P/T) plugs to measure flow of
pressure drop.
Step 8 Electrical Wiring
All field installed wiring, including the electrical ground,
MUST comply with the National Electrical Code (NEC) as
well as applicable local codes. In addition, all field wiring must
conform to the Class II temperature limitations described in the
NEC.
Refer to unit wiring diagrams Fig. 19 and 20 for a schematic
of the field connections, which must be made by the installing
(or electrical) contractor. Refer to Electrical Data for fuse sizes.
Consult the unit wiring diagram located on the inside of the
compressor access panel to ensure proper electrical hookup.
The installing (or electrical) contractor must make the field
connections when using field-supplied disconnect.
Operating voltage must be the same voltage and phase as
shown in Electrical Data shown in Tables 5-7.
Make all final electrical connections with a length of flexi-
ble conduit to minimize vibration and sound transmission to
the building.
IMPORTANT: Failure to comply with the above required
water quality and quantity limitations and the closed-
system application design requirements may cause damage
to the tube-in-tube heat exchanger that is not the responsi-
bility of the manufacturer.
To avoid possible injury or death due to electrical shock,
open the power supply disconnect switch and secure it in
an open position during installation.
Use only copper conductors for field-installed electrical
wiring. Unit terminals are not designed to accept other
types of conductors.
Pressure-
Temperature
Plugs
Boiler
Drains
Strainer Field-Installed Accessory
(16 to 20 mesh recommended for
filter sediment)
Shut-Off
Valve
Water
Control
Valve
Flow
Regulator
Pressure
Tank
Water Out
Water In
From Pump
Fig. 18 Typical Ground-Water Piping Installation
Seitenansicht 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare