Carrier start-up and Installationshandbuch Seite 25

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 48
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 24
25
During the Defrost cycle, output EHEAT is also energized
(if not already energized by a thermostat W2 demand);
supplemental heater will be energized. During the Defrost
Cycle, LED1 on the DFB will be illuminated. The Defrost
cycle ends when DFT opens (as liquid temperature exiting
the coil rises above DFT setpoint) or the defrost cycle runs
for 10 minutes. Output at EHEAT is removed;
supplemental heater will be de-energized (unless
thermostat has a W2 demand). Output at OF is restored;
outdoor fans start again. Output P3–7 (RVS1) is removed;
reversing valve returns to Heating position.
Defrost cycle is fixed at a maximum 10 minute duration
limit. The period to test and initiate a Defrost cycle can be
configured for 30, 60, 90 or 120 minutes.
Supplemental Heat/Emergency Heat
Supplemental heat type is determined by 40RUQ indoor
unit options and accessories. This heat is initiated when
the indoor unit W2 terminal is energized by the
thermostat. (Or as detailed in “Defrost Cycle” on page
19.) The thermostat may energizes W2 as supplemental
(2nd stage) heat at larger space heating demand, or when
selected as emergency heat mode. When the space heating
demand decreases below the 2nd stage limit, or
emergency heat is turned off, W2 is de-energized, and
supplemental heat is turned off.
Cooling and Heating Shutdown
Partial or complete cooling or heating functions may
shutdown caused by loss of main power, open pressure
switches, diagnostic alarms, or open internal compressor
protections. See Service section for further details.
ROUTINE SYSTEM MAINTENANCE
These items should be part of a routine maintenance
program, to be checked every month or two, until a
specific schedule for each can be identified for this
installation:
Quarterly Inspection (and 30 days after initial start) —
Indoor Section
S Coil cleanliness checked.
S Return air filter replacement
S Belt tension checked
S Belt condition checked
S Pulley alignment checked
S Fan shaft bearing locking collar tightness checked
S Condensate drain checked
S Blower motor amperage
Outdoor Section
S Fan motor mounting bolts tightness
S Compressor mounting bolts
S Fan blade positioning
S Control box cleanliness and wiring condition
S Wire terminal tightness
S Refrigerant charge level
Economizer or Outside Air Damper
S Inlet filters condition
S Check damper travel (economizer)
S Check gear and dampers for debris and dirt
SERVICE
Refrigeration System
EQUIPMENT DAMAGE HAZARD
Failure to follow this caution may result in damage to
equipment .
This system uses Puron
R
refrigerant which has higher
pressures than R--22 and other refrigerants. No other
refrigerant may be used in this system. Gage set,
hoses, and recovery system must be designed to
handle Puron
R
. If you are unsure consult the
equipment manufacturer.
CAUTION
!
Compressor Oil
EQUIPMENT DAMAGE HAZARD
Failure to follow this caution may result in damage to
equipment .
The compressor in a Puron system uses a polyolester
(POE) oil. This oil is extremely hygroscopic, meaning
it absorbs water readily. POE oils can absorb 15 times
as much water as other oils designed for HCFC and
CFC refrigerants. Take all necessary precautions to
avoid exposure of the oil to the atmosphere.
CAUTION
!
Servicing Systems on Roofs with Synthetic Materials
POE (polyolester) compressor lubricants are known to
cause long term damage to some synthetic roofing
materials. Exposure, even if immediately cleaned up, may
cause embrittlement (leading to cracking) to occur in one
year or more. When performing any service which may
risk exposure of compressor oil to the roof, take
appropriate precautions to protect roofing. Procedures
which risk oil leakage include but are not limited to
compressor replacement, repairing refrigerants leaks,
replacing refrigerant components such as filter drier,
pressure switch, metering device, coil, accumulator, or
reversing valve.
Synthetic Roof Precautionary Procedure:
1. Cover extended roof working area with an imper-
meable polyethylene (plastic) drop cloth or tarp.
Cover an approximate 10 x 10 ft (3.3 x 3.3 m) area.
38AUQ
Seitenansicht 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 47 48

Kommentare zu diesen Handbüchern

Keine Kommentare