START-UP CHECK LIST
Equipment sold by:
Installed by:
Site address:
Equipment type and serial numbers:
Start-up date:
Refrigerant:
Supply voltage:
Phase imbalance: Ph. 1 V Ph. 2 V Ph. 3 V
Current draw: Ph. 1 A Ph. 2 A Ph. 3 A
Main circuit breaker rating: A
Control circuit voltage: V
Control circuit fuse: A
Condenser water entering temperature: °C
Condenser water leaving temperature: °C
Cooler water entering temperature: °C
Cooler chilled water leaving temperature: °C
Suction pressure: kPa
Discharge pressure: kPa
Control thermostat cut-out: °C
Control thermostat cut-in: °C
Safety thermostat cut-out: °C
Low-pressure switch cut-out: kPa
Low-pressure switch cut-in: kPa
High-pressure switch cut-out: kPa
High-pressure switch cut-in: kPa
Pressure drop through cooler: kPa
Pressure drop through condenser: kPa
Oil level:
Oil visible in sight glass:
Colour of moisture indicator:
Air bubbles visible in sight glass:
Commissioning engineer (name):
Purchase order number: