3
Mount PremierLink™ Control
LOCATION The PremierLink controller should be
located inside one of the available service access panels of the
unit. Be sure the location selected prevents moisture and
rain from coming into contact with the circuit board.
Select a location which will be safe from water damage and
allow sufficient access for service and wiring. For service
access, there should be at least 6 in. of clearance between the
front of the PremierLink controller and adjacent surfaces. Be
sure to leave
1
/
2
-in. clearance in front of RJ-14 connector for
attaching RJ-14 cable from a CCN interface device. A field-
supplied right angle 6-pin RJ-14 connector can be attached if
necessary.
NOTE: If the PremierLink controller must be installed in a
location where there is not easy access to CCN connectors,
a remote connection kit (part number 33CSREMCCN) can
be ordered.
MOUNTING Refer to Mounting Sheet included with
controller for additional detailed mounting instructions.
1. Ensure all power to unit is removed.
2. Locate a space in the unit control panel or a space inside
the equipment that is free from dirt and dust.
3. Remove plastic cover by gently squeezing the middle of
longer sides of the cover and pull away from the board.
This will release the locking tabs inside.
4. Mount the PremierLink controller to the desired location
by holding the controller firmly in place. Be sure all
standoffs are in contact with mounting surface and board
DOES NOT flex! Attach controller to unit using 4 screws
provided ensuring a secure grip to unit surface.
See Fig.1.
NOTE: If PremierLink controller will be installed in same
location where Apollo controller was previously installed,
simply use 2 of the existing Apollo mounting holes to line up
with the board.
5. Provide 24 v power to the circuit board from the unit
transformer or an isolated power transformer. Use the
appropriate conductors for voltage per base unit name-
plate. See Fig. 2. Board will require 10 va at 24 vac.
6. Replace plastic cover to protect circuit board.
7. Restore power to unit.
PremierLink Controller Inputs and Outputs —
The PremierLink controller inputs and outputs are shown in
Table 1.
Control Wiring — The PremierLink controller can be
connected to either a Carrier-approved thermostat or CCN
compatible temperature sensor.
1. Turn off power to the control box.
2. Strip the ends of the red, white, and black conductors of
the communication bus cable.
NOTE: When connecting the communication bus cable, a
color code system for the entire network is recommended to
simplify installation and checkout. See Table 2 for the
recommended color code.
Disconnect electrical power before wiring the Premier-
Link controller. Electrical shock, personal injury, or
damage to the PremierLink controller can result.
Fig. 1 — PremierLink Control Module
a33-9129
Seitenansicht 128
1 2 ... 124 125 126 127 128 129 130 131 132 133 134 ... 315 316

Kommentare zu diesen Handbüchern

Keine Kommentare